Dial cord routing instructions
Instructions for 229, 229A 238, 4229 dial cord routing:
- Turn the inductor fully clockwise to the stop.
- Tie the nylon cord through the hole in the left side of the dial pointer.
- Tie the black stretch cord through the hole in the right side of the pointer.
- Place the pointer on the right-hand end of the sub-panel (almost touching the single pulley) and tape it in place.
- Route the nylon cord as shown above; pull it taut (without moving the pointer) and tie the end SECURELY to the pin on the inductor shaft.
- Route the stretch cord as shown above; take up the slack (not too much) and tie the end into a lasso (not too tightly) around the pot shaft. (The pointer should still be near the right-hand pulley, the nylon cord taut and stretch cord slightly tensed.)
- Remove the tape from the pointer.
- Turn the inductor gently, beginning counter-clockwise; the pointer should move freely and smoothly, all the way to the left and back.
Be the first to comment